AGENCY DATA SURVEY

1998-99 INFORMATION TECHNOLOGY PLAN

 

1. Department: Secretary of Education and the Arts

Agency: Marshall University

 

Your Name: Allen R. Taylor

Director Information Technology

Research, Planning, & Standards

 

Your Phone Number: (304) 696-6195

 

2. Agency Mission. Please provide your agency mission statement.

 

MISSION OF THE UNIVERSITY

 

General Statement of Purpose

 

Upon graduation a baccalaureate student should (1) think logically, critically, and creatively and to be able to recognize this ability in others; (2) communicate ideas clearly and effectively both in speaking and writing; (3) evaluate the influences that help to shape individuals, institutions, and societies; (4) understand the values, achievements, and aesthetic contributions of past and present cultures; and (5) perceive, investigate, and solve problems by enlisting the most appropriate historical, comparative, quantitative, and qualitative research methods available.

 

To assure the mastery of these skills, in addition to specific collegiate demands, the student receiving a baccalaureate degree must satisfy the following requirements: (1) a four-hour integrated science course, (2) a mathematics requirement, (3) six hours in courses designated as international studies and three hours in multicultural studies, (4) computer literacy as designated by the major discipline, (5) three hours of courses designated as writing intensive, and (6) a capstone experience designated by the major field of study.

 

Statement of Philosophy

 

While institutions of higher education differ in size and function, they share a common core of values; these help shape and guide their academic life. Marshall University is committed to seven basic principles.

 

The first and most basic commitment of Marshall University is to undergraduate education.

 

A second and major commitment of Marshall University is the enhancement of graduate education.

 

Third, Marshall University is committed to expanding the body of human knowledge and achievement through research and creative arts activities.

 

A fourth characteristic of Marshall University is its commitment to society through public service.

 

A fifth commitment of this university is diversity in its student body, its faculty and staff, and its educational programs.

 

A sixth commitment of Marshall University is to academic freedom and shared governance.

 

Finally, Marshall University is committed to assuring the integrity of the curriculum through the maintenance of rigorous standards and high expectations for student learning and performance.

 

Identification of Areas of Current Emphasis

 

The following areas of emphasis will command the commitment of institutional resources;

 

High quality undergraduate liberal arts education, broadly defined.

 

A commitment to rural health care, including medicine, nursing, nutrition, health education, health care management, etc.

 

A commitment to schools and schooling, including teacher education and the setting of the agenda for education in southern West Virginia.

 

Economic development, which would include programs in education, science, business, the Community and Technical College, perhaps engineering, and a broad range of fields.

 

A commitment to the fine arts and humanities because Marshall is and should be the cultural center of this community.

 

A new commitment to high quality graduate programs (masters, specialists, and doctoral degrees).

 

Finally, a university concerned with environmental issues, which unquestionably, will be a dominant factor of life in the 21st Century.

 

In accord with the first and most basic commitment of Marshall University as outlined in the Statement of Philosophy of the Mission Statement and the above seven areas of emphasis, Marshall University will strive to develop programs that will be recognized nationally for their excellence. Toward this goal strong emphasis will be placed on high quality teaching and interaction with the individual student. Uniform guidelines for monitoring instruction and corrective measures will be developed and implemented by college deans. Programs that have University commitment to independent accrediting will be brought into compliance and maintain accrediting agency guidelines.

 

The Marshall University Graduate College

 

The mission of the Marshall University Graduate College is to provide graduate educational opportunities to the working adults of West Virginia through instruction, public service and research. Programs are delivered in traditional and non-traditional ways, integrating technology into instruction as appropriate, using dedicated full-time faculty complemented by a cadre of expert adjunct faculty recruited from higher education institutions, business, industry, and other agencies. Throughout West Virginia, MUGC offers master's degrees, professional development, and post master's degree programs according to need, without unnecessary duplication of programs offered by other institutions.

 

 

  1. Agency Accomplishments: Please describe the three most significant Information Technology (IT) accomplishments, in order of importance, for the fiscal year 1996 and 1997.

 

    1. Completion of the Faculty Desktop Initiative which placed at a minimum a Windows 95 or Power Macintosh based networked PC on every Faculty member's desk that did not already have one. All workstations are LAN connected to MUnet, WVNET, and the global Internet.
    2.  

    3. Conversion of all desktop Intel based PCs to Windows 95 or Windows NT 4.0 as part of our project Genesis initiated in July 1995. This project uses a variety of tools to help reduce our Total Cost of Ownership by implementing a streamlined installation and support methodology for desktop PCs. In addition, it began our migration from a Novell NetWare 4.1 centric PC/Mac Server environment to a Windows NT centric environment.
    4.  

    5. Improved coordination and training for faculty in the use of computers in the classroom and instructional process. This activity was lead by initiatives as part of the Technology Advantage program and special project funds in FY96-97 but has expanded to streamline our efforts in multimedia course development and acquisition as well as web based course augmentation and delivery.
    6.  

    7. Continuations of our lead in World Wide Web access to the university systems by providing web browser access to our library holdings via a web gateway. This access will be further extended in FY97-98 with the implementation of a much expanded library system with integration to a merged Graduate College Library. Expanded library services currently being offered include electronic document delivery and full electronic journals. These services will expand as part of our new John Deaver Drinko Library and Information Technology Center.
    8.  

    9. Implementation of over 25 online courses delivered via the World Wide Web, including development and integration of a toolset for faculty to communicate and interact with students for the delivery of courses via the internet.

 

 

4. Information Technology (IT) Expenditure

 

For each object listed below, please provide the dollar amount attributed to IT expenditures for FY96 and FY97

 

 

OBJECT CODE

 

IT EXPENDITURES

(in dollars)

 

1. FY96 Consulting and Professional Services obtained from external vendors

 

85,000

 

2. FY96 Maintenance Contracts for all HW/SW

 

365,000

 

3. FY96 Budgetable Education/Training costs pertaining to Information Technology for the entire department

 

47,000

 

4. FY96 IT Equipment

 

1,483,000

 

5. FY96 IT Personnel Cost (Summation of salaries of IT personnel in the MIS section of your department)

 

810,000

 

6. FY96 Voice Communication

 

1,100,000

 

7. FY96 Data Communication

 

120,000

 

8. FY97 Consulting and Professional Services obtained from external vendors

 

111,000

 

9. FY97 Maintenance Contracts for all HW/SW

 

425,000

 

10. FY97 Budgetable Education/Training costs pertaining to Information Technology for the entir( department

 

87,000

 

11. FY97 IT Equipment

 

1,640,000

12. FY97 IT Personnel Cost (Summation of salaries of IT personnel in the MIS section of your department)

835,000

13. FY97 Voice Communication

1,200,000

14. FY97 Data Communication

157,000

 

 

5. Year 2000 Compliance. Please describe your department's plan for achieving year 2000 compliance, date by which you plan to b compliant, and the estimated costs. (Please ensure that you include legacy systems, PC hardware/software, etc.)

 

The only major system that is not Year 2000 Compliant is our financial system, CUFS. We will be attempting to implement a new financial system during FY97-98.

6. Please suggest interdepartmental projects that would help increase the efficiency of West Virginia State government (i.e. Smar-t etc.)

 

A critical project is to provide an extremely cost effective state-wide ATM network for education that will integrate voice, data, and video and provide extremely high bandwidth access to the global Internet and Internet2.

 

7. Agency's Major IT (Information Technology) Projects. Please identify your five most significant IT projects, in order of importance, for FY98-99, and your three most significant IT projects, in order of importance, for FYOO-01.

 

Top Five Projects FY98-99

 

  1. During FY97-98 we will be in transition to complete our merger with the West Virginia Graduate College. We are expecting to complete the merger of all-major computer and software systems including the student database by July 1998.
  2. Implementation of the John Deaver Drinko Library/Information Technology Center. This major project is expected to be complete during the summer of 1998. It will involve a major expansion of our electronic library services both on and off campus. We will add some 800 new nodes to our network, now at 2800 nodes, and establish a new Sonet based POP with Bell Atlantic of West Virginia.
  3. We will evolve our campus FDDI backbone to a switched environment. This project was begun in 1996-1997 and expected to be complete before 2000.
  4. Establish a high bandwidth (OC3) Intranet connection with our new South Charleston Campus. This service will give students direct access to our Student Administrative System to conduct business with the university from a web browser. This will greatly extend our voice response telephone registration system that went in production in 1995.
  5. Banner Web Access. This service will give students direct access to our Student Administrative System to conduct business with the university from a web browser. This will greatly extend our voice response telephone registration system that went in production in 1995.

 

Top Three Projects FY00-01

 

  1. Major expansion and upgrade to main campus fiber and copper cable plant, which was originally put in place in 1986.
  2. Expand and put into production video course servers.
  3. Implementations of an extended digital wireless voice and low speed data network on campus.

 

Additional Major Projects

 

  1. Banner Human Resources is due to be implemented FY97-98. This system will integrate our human resources functions.
  2. CUFS Migration. The only major system that is not Year 2000 compliant is our financial system, CUFS. We plan to identify and perhaps implement an integrated and departmental user-friendly replacement to CUFS during FY97 with full replacement required by July 1, 1999.
  3. VTLS to Virtua Migration. We will be migrating our VTLS Library System to a client server based system called Virtua. Software and Hardware were acquired during FY97 and implementation should be complete by summer 1998. This project will also integrate the Marshall University Graduate College library in South Charleston.
  4. Campus Wide Imaging/Document Management System. Initiate imaging to eliminate paper and integrate to our groupware, messaging, and workflow software.
  5. Migration of All-In-1 to Microsoft Exchange. Migration of our Office Automation from All-In-1 to Microsoft Office 97/98 and Microsoft Exchange. Begun in FY97 and expected to be complete in FY98.
  6. Campus One Card ID System. This project will update our ID Card system to expand its Debit Card functions and expand it to door and building access as part of our new Drinko Library/IT Center. It will begin in FY97 and is expected to be fully implemented in FY98.
  7. Electronic Master Classroom Expansion. This multi-year project involves an centrally funded controlled expansion of network access, projection, and digital interaction services in general classrooms.
  8. WVRHEP. The MUSOM is implementing a number of online resource in support of the administration of the West Virginia Rural Health Education Partnerships, WVRHEP, including electronic mail discussion lists, hypermail archives, a comprehensive WWW site and Tracker, a centralized scheduling and tracking system for rural clinical rotations from all schools and in all disciplines.
  9. Rural Health. Under contract agreements with the WV Bureau for Public Health and the Berkeley County Health Department, the MUSOM has developed and hosts comprehensive WWW sites for both the public health and health care consumer audiences, including the electronic publication of the WV Vital Statistics report and West Virginia's WellnessWeb, funded in part by Bell Atlanti and in use throughout West Virginia's public schools.
  10. Clinical Practice Center. Implement LANs within the new Clinical Practice Center, including infrastructure, computer laboratories for student use and WAN connections to the main campus as a cooperative effort with Cabell Huntington Hospital.
  11. Electronic Patient Record. The implementation of an electronic patient record system in the Clinical Practice Center, including the digital integration of patient health care data, wireless network connectivity and pen or voice based data entry terminals to be used by healthcare providers.

 

 

8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.

 

 

PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).

 

1. Graduate College Database Integration

 

STRATEGIC OVERVIEW

 

  1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.

It involves the integration and reengineering of of business processes to complete a merger of the West Virginia Graduate College data system into the Marshall University data system.

 

2. When this IT project is categorized by "project type," which major category best describes it?

 

Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column.

Application Development

Hardware

Software

Networking

Training

Some Other? Please list below.

X

 

3. Please describe any new/emerging technologies involved with this IT Project.

 

A client/server version of Oracle/Banner will be implemented during this project.

 

4. Please describe any statutory changes required for this project.

 

 

5. If this project can or should allow for public access, please describe how.

 

 

6. Please identify the platform type.

 

Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column.

Mainframe

Mid-Tier

PC

Some Other? Please explain below.

X

X

X

 

 

 

  1. NEW PROJFCT RESOURCES

 

Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".

 

1. Please describe the proposed system hardware.

 

Integration with existing database, web, and voice response servers of Marshall University thereby saving this expense by the Graduate College.

 

2. Please describe the proposed system software.

 

Oracle/SCT Banner Client Server.

 

3. In A., B., and C. below, please describe the proposed telecommunications impact.

 

    1. Please describe any new VOICE requirements:
    2.  

      Expanded telephone access to our Voice Response System will be required to provide service to Graduate College Students.

       

    3. Please describe any new DATA requirements:
    4.  

      Expanded bandwidth between the Huntington and South Charleston campuses.

       

    5. Please describe any OTHER new telecommunications requirements:

 

4. How many new FTEs are associated with this project?

 

None. Existing personnel will be used and by merging staffs we will be able to provide more services with the same number of staff.

 

10. COSTS

 

Please complete the following table as it is pertinent to the specific date of the project.

 

 

FY98

FY99

FY00

FY01

New Hardware

       

New Software

       

New FTE (Total Annual Cost)

       

Contract Services

$10,000

     

Associated Training

$10,000

     

Communications

       

Please list Other Major Costs and their associated dollar amounts:

 

11. PROJECT SCHEDULE Please complete the following table.

 

FY

Qtr 1

Qtr 2

Qtr 3

Qtr 4

Start Date

97

     

X

Completion Date

98

     

X

 

 

8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.

 

 

PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).

 

2. John Deaver Drinko Library/IT Center

 

STRATEGIC OVERVIEW

 

1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.

 

This will involve a reengineering of our Computing Services and Library groups to provide a foundation for an integrated Information Technology group to be housed in a new facility provided expanded IT Services.

 

  1. When this IT project is categorized by "project type," which major category best describes it?

 

Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column.

Application Development

Hardware

Software

Networking

Training

Some Other? Please list below.

X

X

X

X

X

 

3. Please describe any new/emerging technologies involved with this IT Project.

 

ATM networking, wireless networking, remote electronic delivery services,

 

4. Please describe any statutory changes required for this project.

 

 

 

5. If this project can or should allow for public access, please describe how.

 

Greatly expanded public access to university library facilities.

 

6. Please identify the platform type.

 

Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column.

Mainframe

Mid-Tier

PC

Some Other? Please explain below.

X

X

X

 

 

 

  1. NEW PROJFCT RESOURCES

 

Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".

 

1. Please describe the proposed system hardware.

 

Eight Hundred Network connections & three hundred workstations.

 

2. Please describe the proposed system software.

 

Windows NT 5.x

 

3. In A., B., and C. below, please describe the proposed telecommunications impact.

 

    1. Please describe any new VOICE requirements:
    2.  

      PBX Upgrades

       

    3. Please describe any new DATA requirements:
    4.  

      High bandwidth switched service ethernet/ATM.

       

    5. Please describe any OTHER new telecommunications requirements:

 

Integrated data, voice, and Video.

 

  1. How many new FTEs are associated with this project?

 

Staffing for 24hour study facility.

 

10. COSTS

 

Please complete the following table as it is pertinent to the specific date of the project.

 

 

FY98

FY99

FY00

FY01

New Hardware

2,100,000

     

New Software

200,000

     

New FTE (Total Annual Cost)

 

150,000

160,000

175,000

Contract Services

       

Associated Training

       

Communications

100,000

     

 

Please list Other Major Costs and their associated dollar amounts:

 

11. PROJECT SCHEDULE Please complete the following table.

 

FY

Qtr 1

Qtr 2

Qtr 3

Qtr 4

Start Date

96

X

     

Completion Date

99

X

     

 

 

8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.

 

 

PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).

 

3. Campus Network Backbone FDDI to Switch

 

STRATEGIC OVERVIEW

 

1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.

 

Movement of routed FDDI main campus backbone to switched ATM or gigabit ethernet.

 

2. When this IT project is categorized by "project type," which major category best describes it?

 

Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column.

Application Development

Hardware

Software

Networking

Training

Some Other? Please list below.

X

 

3. Please describe any new/emerging technologies involved with this IT Project.

 

ATM and Gigabit Ethernet.

 

4. Please describe any statutory changes required for this project.

 

 

 

5. If this project can or should allow for public access, please describe how.

 

 

 

6. Please identify the platform type.

 

Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column.

Mainframe

Mid-Tier

PC

Some Other? Please explain below.

NETWORK SWITCHING

 

 

 

  1. NEW PROJFCT RESOURCES

 

Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".

 

1. Please describe the proposed system hardware.

 

Multiple WAN and LAN based switches integrating existing ethernet and FDDI.

 

2. Please describe the proposed system software.

 

Switching/LANE.

 

3. In A., B., and C. below, please describe the proposed telecommunications impact.

 

    1. Please describe any new VOICE requirements:
    2.  

       

       

    3. Please describe any new DATA requirements:
    4.  

       

       

    5. Please describe any OTHER new telecommunications requirements:

 

 

 

4. How many new FTEs are associated with this project?

 

10. COSTS

 

Please complete the following table as it is pertinent to the specific date of the project.

 

 

FY98

FY99

FY00

FY01

New Hardware

75,000

75,000

75,000

75,000

New Software

       

New FTE (Total Annual Cost)

       

Contract Services

10,000

5,000

   

Associated Training

5,000

     

Communications

       

 

Please list Other Major Costs and their associated dollar amounts:

 

11. PROJECT SCHEDULE

Please complete the following table.

 

FY

Qtr 1

Qtr 2

Qtr 3

Qtr 4

Start Date

96

 

X

   

Completion Date

99

 

X

   

 

 

8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.

 

 

PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).

 

PROJECT 4 - ATM Intranet to MUGC Campus

 

STRATEGIC OVERVIEW

 

1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.

 

Administrative and Academic intranet integration of South Charleston Campus with integrated voice, data, and video.

 

2. When this IT project is categorized by "project type," which major category best describes it?

 

Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column.

Application Development

Hardware

Software

Networking

Training

Some Other? Please list below.

X

 

3. Please describe any new/emerging technologies involved with this IT Project.

 

ATM, OC3, Sonet.

 

4. Please describe any statutory changes required for this project.

 

 

5. If this project can or should allow for public access, please describe how.

 

 

 

6. Please identify the platform type.

 

Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column.

Mainframe

Mid-Tier

PC

Some Other? Please explain below.

NETWORK SWITCHING AND PBX

 

 

 

  1. NEW PROJFCT RESOURCES

 

Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".

 

1. Please describe the proposed system hardware.

 

WAN Switches Integrated to existing PBXs, video switches and data networks.

 

2. Please describe the proposed system software.

 

 

 

3. In A., B., and C. below, please describe the proposed telecommunications impact.

 

    1. Please describe any new VOICE requirements:
    2.  

       

       

    3. Please describe any new DATA requirements:
    4.  

       

       

    5. Please describe any OTHER new telecommunications requirements:

 

 

 

4. How many new FTEs are associated with this project?

 

10. COSTS

 

Please complete the following table as it is pertinent to the specific date of the project.

 

 

FY98

FY99

FY00

FY01

New Hardware

150,000

     

New Software

       

New FTE (Total Annual Cost)

       

Contract Services

10,000

     

Associated Training

5,000

     

Communications

50,000

100,000

100,000

100,000

 

Please list Other Major Costs and their associated dollar amounts:

 

11. PROJECT SCHEDULE

Please complete the following table.

 

FY

Qtr 1

Qtr 2

Qtr 3

Qtr 4

Start Date

98

 

X

   

Completion Date

98

     

X

 

 

8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.

 

 

PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).

 

PROJECT 5 - Implementation of Banner Web

 

STRATEGIC OVERVIEW

 

1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.

 

This is a customer service enhancement that will provide students direct access to register, obtain grades, and transact most business with the university from any internet web browser.

 

2. When this IT project is categorized by "project type," which major category best describes it?

 

Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column.

Application Development

Hardware

Software

Networking

Training

Some Other? Please list below.

X

X

DATA COLLECTION

 

3. Please describe any new/emerging technologies involved with this IT Project.

 

Three tier Web – Database interaction.

 

4. Please describe any statutory changes required for this project.

 

 

 

5. If this project can or should allow for public access, please describe how.

 

Public access for admission applications and other information.

 

6. Please identify the platform type.

 

Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column.

Mainframe

Mid-Tier

PC

Some Other? Please explain below.

X

X

X

INTERNET

 

 

 

  1. NEW PROJFCT RESOURCES

 

Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".

 

1. Please describe the proposed system hardware.

 

This will run on existing Alpha Server 4100 5/466 w/2GB RAM and 50GB disk/FDDI backbone connected.

 

2. Please describe the proposed system software.

 

Web/database transaction interface

 

3. In A., B., and C. below, please describe the proposed telecommunications impact.

 

    1. Please describe any new VOICE requirements:
    2.  

       

    3. Please describe any new DATA requirements:
    4.  

       

    5. Please describe any OTHER new telecommunications requirements:

 

 

 

4. How many new FTEs are associated with this project?

 

10. COSTS

 

Please complete the following table as it is pertinent to the specific date of the project.

 

 

FY98

FY99

FY00

FY01

New Hardware

       

New Software

       

New FTE (Total Annual Cost)

       

Contract Services

       

Associated Training

       

Communications

       

 

Please list Other Major Costs and their associated dollar amounts:

 

11. PROJECT SCHEDULE

Please complete the following table.

 

FY

Qtr 1

Qtr 2

Qtr 3

Qtr 4

Start Date

97

   

X

 

Completion Date

98

 

X

   

 

 

8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.

 

 

PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).

 

PROJECT 1 – FY00/01 – Augmentation of Campus Fiber/Cable Plant

 

STRATEGIC OVERVIEW

 

1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.

 

Fiber and Cat 5 Plus cable and distribution systems needed for anticipated bandwidth growth.

 

2. When this IT project is categorized by "project type," which major category best describes it?

 

Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column.

Application Development

Hardware

Software

Networking

Training

Some Other? Please list below.

X

 

3. Please describe any new/emerging technologies involved with this IT Project.

 

Fiber and Cat 5 Plus cable and distribution systems.

 

4. Please describe any statutory changes required for this project.

 

 

 

5. If this project can or should allow for public access, please describe how.

 

 

 

6. Please identify the platform type.

 

Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column.

Mainframe

Mid-Tier

PC

Some Other? Please explain below.

NETWORKING

 

 

 

  1. NEW PROJFCT RESOURCES

 

Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".

 

1. Please describe the proposed system hardware.

 

 

 

2. Please describe the proposed system software.

 

 

 

3. In A., B., and C. below, please describe the proposed telecommunications impact.

 

    1. Please describe any new VOICE requirements:
    2.  

       

       

    3. Please describe any new DATA requirements:
    4.  

       

       

    5. Please describe any OTHER new telecommunications requirements:

 

 

 

4. How many new FTEs are associated with this project?

 

10. COSTS

 

Please complete the following table as it is pertinent to the specific date of the project.

 

 

FY98

FY99

FY00

FY01

New Hardware

       

New Software

       

New FTE (Total Annual Cost)

       

Contract Services

       

Associated Training

       

Communications

 

250,000

250,000

250,000

 

Please list Other Major Costs and their associated dollar amounts:

 

11. PROJECT SCHEDULE

Please complete the following table.

 

FY

Qtr 1

Qtr 2

Qtr 3

Qtr 4

Start Date

99

X

     

Completion Date

02

     

X

 

 

8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.

 

 

PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).

 

PROJECT 2 – FY00-01 Expansion of Video Server

 

STRATEGIC OVERVIEW

 

1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.

 

 

 

2. When this IT project is categorized by "project type," which major category best describes it?

 

Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column.

Application Development

Hardware

Software

Networking

Training

Some Other? Please list below.

X

X

X

 

3. Please describe any new/emerging technologies involved with this IT Project.

 

DVD jukebox and MPEG2 Video with compression delivery on demand.

 

4. Please describe any statutory changes required for this project.

 

 

 

5. If this project can or should allow for public access, please describe how.

 

 

 

6. Please identify the platform type.

 

Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column.

Mainframe

Mid-Tier

PC

Some Other? Please explain below.

X

X

NETWORK STORAGE SERVER

 

 

 

  1. NEW PROJFCT RESOURCES

 

Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".

 

1. Please describe the proposed system hardware.

 

Network storage server with over 1TB capacity.

 

2. Please describe the proposed system software.

 

Unknown

 

3. In A., B., and C. below, please describe the proposed telecommunications impact.

 

    1. Please describe any new VOICE requirements:
    2.  

       

       

    3. Please describe any new DATA requirements:
    4.  

      High bandwidth switched service.

       

    5. Please describe any OTHER new telecommunications requirements:

 

Video on demand.

 

4. How many new FTEs are associated with this project?

 

10. COSTS

 

Please complete the following table as it is pertinent to the specific date of the project.

 

 

FY98

FY99

FY00

FY01

New Hardware

   

250,000

250,000

New Software

   

50,000

50,000

New FTE (Total Annual Cost)

       

Contract Services

 

20,000

   

Associated Training

       

Communications

       

 

Please list Other Major Costs and their associated dollar amounts:

 

11. PROJECT SCHEDULE

Please complete the following table.

 

FY

Qtr 1

Qtr 2

Qtr 3

Qtr 4

Start Date

99

     

X

Completion Date

01

 

X

   

 

 

 

8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.

 

 

PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).

 

PROJECT 3 – FY00-01 – Wireless Campus Initiative.

 

STRATEGIC OVERVIEW

 

1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.

 

NEW

 

2. When this IT project is categorized by "project type," which major category best describes it?

 

Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column.

Application Development

Hardware

Software

Networking

Training

Some Other? Please list below.

X

 

3. Please describe any new/emerging technologies involved with this IT Project.

 

PCS and Spreadspectrum wireless.

 

4. Please describe any statutory changes required for this project.

 

 

 

5. If this project can or should allow for public access, please describe how.

 

 

 

6. Please identify the platform type.

 

Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column.

Mainframe

Mid-Tier

PC

Some Other? Please explain below.

X

X

NETWORKING

 

 

 

  1. NEW PROJFCT RESOURCES

 

Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".

 

1. Please describe the proposed system hardware.

 

Wireless connections to ATM backbone and PBX.

 

2. Please describe the proposed system software.

 

 

 

3. In A., B., and C. below, please describe the proposed telecommunications impact.

 

    1. Please describe any new VOICE requirements:
    2.  

       

       

    3. Please describe any new DATA requirements:
    4.  

       

       

    5. Please describe any OTHER new telecommunications requirements:

 

 

 

4. How many new FTEs are associated with this project?

 

10. COSTS

 

Please complete the following table as it is pertinent to the specific date of the project.

 

 

FY98

FY99

FY00

FY01

New Hardware

50,000

50,000

150,000

150,000

New Software

       

New FTE (Total Annual Cost)

       

Contract Services

       

Associated Training

5,000

5,000

   

Communications

       

 

Please list Other Major Costs and their associated dollar amounts:

 

11. PROJECT SCHEDULE

Please complete the following table.

 

FY

Qtr 1

Qtr 2

Qtr 3

Qtr 4

Start Date

98

     

X

Completion Date

01

     

X

 

 

12. HARDWARE INVENTORY:

 

How many of the following systems do you have installed in your department (including divisions/agencies within your department).

 

1.Pentium Pro machines / Pentium II

165

2. Pentium based machines

675

3. 80486 based machines

810

4. 80386 based machines

0

5. 80286 or older machines

0

6. Macintosh's

221

7.RISC based workstations (Please specify) Silicon Graphics

2

8. Alpha PC's

12

9. Power PC's

5

10.Other Hardware 1 DEC Alpha 4100

3

11.Other Hardware 2 DEC Alpha 2100

2

12.Other Hardware 3 DEC VAX 6000

2

 

 

13. SOFTWARE INVENTORY

 

Which of the following software products do you have installed in your department:

 

 

 

 

DESKTOP APPLICATIONS

COREL SUITE (Any Version)

43

MICROSOFT SUITE (Any Version)

1050

LOTUS SUITE (Any Version)

125

OTHER SUITE I

 

OTHER SUITE 2

 

OTHER SUITE 3

 

WordPerfect (Any Version)

875

QUARTO PRO (Any Version)

130

PARADOX (Any Version)

110

WORD (Any Version)

40

ACCESS (Any Version)

20

EXCEL (Any Version)

20

LOTUS 1-2-3 (Any Version)

 

OTHER APPLICATION I MATHEMATICA

110

OTHER APPLICATION 2 SAS

150

OTHER APPLICATION 3 SPSS

500

DESKTOP OPERATING SYSTEMS

OS/2

10

WINDOWS 3.1X

150

WINDOWS-95

1750

WINDOWS NT – WORKSTATION VERSION 3.50 OR OLDER

 

WINDOWS NT – WORKSTATION VERSION 3.51

 

WINDOWS NT – WORKSTATION VERSION 4.0

85

OTHER OPERATING SYSTEM 1 Open VMS Alpha

15/unlimited

OTHER OPERATING SYSTEM 2 Digital UNIX

15/unlimited

OTHER OPERATING SYSTEM 3 IBM AIX

5/unlimited

NETWORK OPERATING SYSTEMS

WINDOWS NT SERVER VERSION 3.50 OR OLDER

 

WINDOWS NT SERVER VERSION 3.51

 

WINDOWS NT SERVER VERSION 4.0

15/1750

NOVELL NETWARE VERSION 3.11 OR OLDER

5/500

NOVELL NETWARE VERSION 3.12

 

NOVELL NETWARE VERSION 4.01

 

NOVELL NETWARE VERSION4.10

 

NOVELL NETWARE VERSION 4.11

4/1700

OS/2 WAPP SERVER

 

OS/2 LAN SERVER

 

OTHER NOS I Samba/Digital UNIX/Linix

5/unlimited

OTHER NOS 2

 

OTHER NOS 3

 

NETWORK APPLICATIONS - RDBMS

MS SQL SERVER

3/1750

ORACLE

5/544

SYBASE

 

WATCOM

 

DB2

 

OTHER RDBMS 1

 

OTHER RDBMS 2

 

OTHER RDBMS 3

 

E-MAIL PACKAGES

NOVELL GROUPWISE

180

MS MAIL

 

MS EXCHANGE SERVER

2/1750

CC MAIL

 

LOTUS NOTES

 

MHS/FIRST MAIL

 

OTHER E-MAIL PACKAGE 1 PINE

UNLIMITED

OTHER E-MAIL PACKAGE 2 ALL-IN-1

UNLIMITED

OTHER E-MAIL PACKAGE 3

 

COMMUNICATIONS SERVERS

SNA SERVER

 

SAA SERVER

1/100

OTHER COMMUNICATIONS SERVER 1

 

OTHER COMMUNICATIONS SERVER 2

 

OTHER COMMUNICATIONS SERVER 3

 

 

14. ORGANIZATION CHART

 

Please provide two separate organizational charts for your department; one chart that shows the department as a whole and the other chart shows the MIS section. If there are multiple MIS units within your department, they all should be noted and a separate organization chart pertaining to each MIS sections should be provided. You can mail the organizational charts via interdepartmental mail (along with the survey on a diskette) to the attention of Deepesh Randeri at IS&C Building 6 Room B- I IO.

 

 

 

THANK YOU! We appreciate the time and effort you have extended to make the new Information Technology information document. If you have questions about this survey, please contact Deepesh Randeri of IS&C at 558-1360.