AGENCY DATA SURVEY
1998-99 INFORMATION TECHNOLOGY PLAN
1. Department:
Secretary of Education and the ArtsAgency: Marshall University
Your Name: Allen R. Taylor
Director Information Technology
Research, Planning, & Standards
Your Phone Number: (304) 696-6195
2. Agency Mission.
Please provide your agency mission statement.
MISSION OF THE UNIVERSITY
General Statement of Purpose
Upon graduation a baccalaureate student should (1) think logically, critically, and creatively and to be able to recognize this ability in others; (2) communicate ideas clearly and effectively both in speaking and writing; (3) evaluate the influences that help to shape individuals, institutions, and societies; (4) understand the values, achievements, and aesthetic contributions of past and present cultures; and (5) perceive, investigate, and solve problems by enlisting the most appropriate historical, comparative, quantitative, and qualitative research methods available.
To assure the mastery of these skills, in addition to specific collegiate demands, the student receiving a baccalaureate degree must satisfy the following requirements: (1) a four-hour integrated science course, (2) a mathematics requirement, (3) six hours in courses designated as international studies and three hours in multicultural studies, (4) computer literacy as designated by the major discipline, (5) three hours of courses designated as writing intensive, and (6) a capstone experience designated by the major field of study.
Statement of Philosophy
While institutions of higher education differ in size and function, they share a common core of values; these help shape and guide their academic life. Marshall University is committed to seven basic principles.
The first and most basic commitment of Marshall University is to undergraduate education.
A second and major commitment of Marshall University is the enhancement of graduate education.
Third, Marshall University is committed to expanding the body of human knowledge and achievement through research and creative arts activities.
A fourth characteristic of Marshall University is its commitment to society through public service.
A fifth commitment of this university is diversity in its student body, its faculty and staff, and its educational programs.
A sixth commitment of Marshall University is to academic freedom and shared governance.
Finally, Marshall University is committed to assuring the integrity of the curriculum through the maintenance of rigorous standards and high expectations for student learning and performance.
Identification of Areas of Current Emphasis
The following areas of emphasis will command the commitment of institutional resources;
High quality undergraduate liberal arts education, broadly defined.
A commitment to rural health care, including medicine, nursing, nutrition, health education, health care management, etc.
A commitment to schools and schooling, including teacher education and the setting of the agenda for education in southern West Virginia.
Economic development, which would include programs in education, science, business, the Community and Technical College, perhaps engineering, and a broad range of fields.
A commitment to the fine arts and humanities because Marshall is and should be the cultural center of this community.
A new commitment to high quality graduate programs (masters, specialists, and doctoral degrees).
Finally, a university concerned with environmental issues, which unquestionably, will be a dominant factor of life in the 21st Century.
In accord with the first and most basic commitment of Marshall University as outlined in the Statement of Philosophy of the Mission Statement and the above seven areas of emphasis, Marshall University will strive to develop programs that will be recognized nationally for their excellence. Toward this goal strong emphasis will be placed on high quality teaching and interaction with the individual student. Uniform guidelines for monitoring instruction and corrective measures will be developed and implemented by college deans. Programs that have University commitment to independent accrediting will be brought into compliance and maintain accrediting agency guidelines.
The Marshall University Graduate College
The mission of the Marshall University Graduate College is to provide graduate educational opportunities to the working adults of West Virginia through instruction, public service and research. Programs are delivered in traditional and non-traditional ways, integrating technology into instruction as appropriate, using dedicated full-time faculty complemented by a cadre of expert adjunct faculty recruited from higher education institutions, business, industry, and other agencies. Throughout West Virginia, MUGC offers master's degrees, professional development, and post master's degree programs according to need, without unnecessary duplication of programs offered by other institutions.
4. Information Technology (IT) Expenditure
For each object listed below, please provide the dollar amount attributed to IT expenditures for FY96 and FY97
|
OBJECT CODE |
IT EXPENDITURES (in dollars) |
|
1. FY96 Consulting and Professional Services obtained from external vendors |
85,000 |
|
2. FY96 Maintenance Contracts for all HW/SW |
365,000 |
|
3. FY96 Budgetable Education/Training costs pertaining to Information Technology for the entire department |
47,000 |
|
4. FY96 IT Equipment |
1,483,000 |
|
5. FY96 IT Personnel Cost (Summation of salaries of IT personnel in the MIS section of your department) |
810,000 |
|
6. FY96 Voice Communication |
1,100,000 |
|
7. FY96 Data Communication |
120,000 |
|
8. FY97 Consulting and Professional Services obtained from external vendors |
111,000 |
|
9. FY97 Maintenance Contracts for all HW/SW |
425,000 |
|
10. FY97 Budgetable Education/Training costs pertaining to Information Technology for the entir( department |
87,000 |
|
11. FY97 IT Equipment |
1,640,000 |
|
12. FY97 IT Personnel Cost (Summation of salaries of IT personnel in the MIS section of your department) |
835,000 |
|
13. FY97 Voice Communication |
1,200,000 |
|
14. FY97 Data Communication |
157,000 |
5. Year 2000 Compliance. Please describe your department's plan for achieving year 2000 compliance, date by which you plan to b compliant, and the estimated costs. (Please ensure that you include legacy systems, PC hardware/software, etc.)
The only major system that is not Year 2000 Compliant is our financial system, CUFS. We will be attempting to implement a new financial system during FY97-98.
6. Please suggest interdepartmental projects that would help increase the efficiency of West Virginia State government (i.e. Smar-t etc.)
A critical project is to provide an extremely cost effective state-wide ATM network for education that will integrate voice, data, and video and provide extremely high bandwidth access to the global Internet and Internet2.
7. Agency's Major IT (Information Technology) Projects. Please identify your five most significant IT projects, in order of importance, for FY98-99, and your three most significant IT projects, in order of importance, for FYOO-01.
Top Five Projects FY98-99
Top Three Projects FY00-01
Additional Major Projects
8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.
PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).
1. Graduate College Database Integration
STRATEGIC OVERVIEW
It involves the integration and reengineering of of business processes to complete a merger of the West Virginia Graduate College data system into the Marshall University data system.
2. When this IT project is categorized by "project type," which major category best describes it?
|
Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column. |
|||||
|
Application Development |
Hardware |
Software |
Networking |
Training |
Some Other? Please list below. |
|
X |
|||||
3. Please describe any new/emerging technologies involved with this IT Project.
A client/server version of Oracle/Banner will be implemented during this project.
4. Please describe any statutory changes required for this project.
5. If this project can or should allow for public access, please describe how.
6. Please identify the platform type.
|
Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column. |
|||
|
Mainframe |
Mid-Tier |
PC |
Some Other? Please explain below. |
|
X |
X |
X |
|
Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".
1. Please describe the proposed system hardware.
Integration with existing database, web, and voice response servers of Marshall University thereby saving this expense by the Graduate College.
2. Please describe the proposed system software.
Oracle/SCT Banner Client Server.
3. In A., B., and C. below, please describe the proposed telecommunications impact.
Expanded telephone access to our Voice Response System will be required to provide service to Graduate College Students.
Expanded bandwidth between the Huntington and South Charleston campuses.
4. How many new FTEs are associated with this project?
None. Existing personnel will be used and by merging staffs we will be able to provide more services with the same number of staff.
10.
COSTS
Please complete the following table as it is pertinent to the specific date of the project.
|
FY98 |
FY99 |
FY00 |
FY01 |
|
|
New Hardware |
||||
|
New Software |
||||
|
New FTE (Total Annual Cost) |
||||
|
Contract Services |
$10,000 |
|||
|
Associated Training |
$10,000 |
|||
|
Communications |
Please list Other Major Costs and their associated dollar amounts:
11. PROJECT SCHEDULE Please complete the following table.
|
FY |
Qtr 1 |
Qtr 2 |
Qtr 3 |
Qtr 4 |
|
|
Start Date |
97 |
X |
|||
|
Completion Date |
98 |
X |
8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.
PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).
2. John Deaver Drinko Library/IT Center
STRATEGIC OVERVIEW
1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.
This will involve a reengineering of our Computing Services and Library groups to provide a foundation for an integrated Information Technology group to be housed in a new facility provided expanded IT Services.
|
Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column. |
|||||
|
Application Development |
Hardware |
Software |
Networking |
Training |
Some Other? Please list below. |
|
X |
X |
X |
X |
X |
|
3. Please describe any new/emerging technologies involved with this IT Project.
ATM networking, wireless networking, remote electronic delivery services,
4. Please describe any statutory changes required for this project.
5. If this project can or should allow for public access, please describe how.
Greatly expanded public access to university library facilities.
6. Please identify the platform type.
|
Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column. |
|||
|
Mainframe |
Mid-Tier |
PC |
Some Other? Please explain below. |
|
X |
X |
X |
|
Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".
1. Please describe the proposed system hardware.
Eight Hundred Network connections & three hundred workstations.
2. Please describe the proposed system software.
Windows NT 5.x
3. In A., B., and C. below, please describe the proposed telecommunications impact.
PBX Upgrades
High bandwidth switched service ethernet/ATM.
Integrated data, voice, and Video.
Staffing for 24hour study facility.
10.
COSTS
Please complete the following table as it is pertinent to the specific date of the project.
|
FY98 |
FY99 |
FY00 |
FY01 |
|
|
New Hardware |
2,100,000 |
|||
|
New Software |
200,000 |
|||
|
New FTE (Total Annual Cost) |
150,000 |
160,000 |
175,000 |
|
|
Contract Services |
||||
|
Associated Training |
||||
|
Communications |
100,000 |
Please list Other Major Costs and their associated dollar amounts:
11. PROJECT SCHEDULE Please complete the following table.
|
FY |
Qtr 1 |
Qtr 2 |
Qtr 3 |
Qtr 4 |
|
|
Start Date |
96 |
X |
|||
|
Completion Date |
99 |
X |
8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.
PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).
3. Campus Network Backbone FDDI to Switch
STRATEGIC OVERVIEW
1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.
Movement of routed FDDI main campus backbone to switched ATM or gigabit ethernet.
2. When this IT project is categorized by "project type," which major category best describes it?
|
Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column. |
|||||
|
Application Development |
Hardware |
Software |
Networking |
Training |
Some Other? Please list below. |
|
X |
|||||
3. Please describe any new/emerging technologies involved with this IT Project.
ATM and Gigabit Ethernet.
4. Please describe any statutory changes required for this project.
5. If this project can or should allow for public access, please describe how.
6. Please identify the platform type.
|
Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column. |
|||
|
Mainframe |
Mid-Tier |
PC |
Some Other? Please explain below. |
|
NETWORK SWITCHING |
|||
Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".
1. Please describe the proposed system hardware.
Multiple WAN and LAN based switches integrating existing ethernet and FDDI.
2. Please describe the proposed system software.
Switching/LANE.
3. In A., B., and C. below, please describe the proposed telecommunications impact.
4. How many new FTEs are associated with this project?
10.
COSTS
Please complete the following table as it is pertinent to the specific date of the project.
|
FY98 |
FY99 |
FY00 |
FY01 |
|
|
New Hardware |
75,000 |
75,000 |
75,000 |
75,000 |
|
New Software |
||||
|
New FTE (Total Annual Cost) |
||||
|
Contract Services |
10,000 |
5,000 |
||
|
Associated Training |
5,000 |
|||
|
Communications |
Please list Other Major Costs and their associated dollar amounts:
11. PROJECT SCHEDULE
Please complete the following table.
|
FY |
Qtr 1 |
Qtr 2 |
Qtr 3 |
Qtr 4 |
|
|
Start Date |
96 |
X |
|||
|
Completion Date |
99 |
X |
8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.
PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).
PROJECT 4 - ATM Intranet to MUGC Campus
STRATEGIC OVERVIEW
1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.
Administrative and Academic intranet integration of South Charleston Campus with integrated voice, data, and video.
2. When this IT project is categorized by "project type," which major category best describes it?
|
Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column. |
|||||
|
Application Development |
Hardware |
Software |
Networking |
Training |
Some Other? Please list below. |
|
X |
|||||
3. Please describe any new/emerging technologies involved with this IT Project.
ATM, OC3, Sonet.
4. Please describe any statutory changes required for this project.
5. If this project can or should allow for public access, please describe how.
6. Please identify the platform type.
|
Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column. |
|||
|
Mainframe |
Mid-Tier |
PC |
Some Other? Please explain below. |
|
NETWORK SWITCHING AND PBX |
|||
Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".
1. Please describe the proposed system hardware.
WAN Switches Integrated to existing PBXs, video switches and data networks.
2. Please describe the proposed system software.
3. In A., B., and C. below, please describe the proposed telecommunications impact.
4. How many new FTEs are associated with this project?
10.
COSTS
Please complete the following table as it is pertinent to the specific date of the project.
|
FY98 |
FY99 |
FY00 |
FY01 |
|
|
New Hardware |
150,000 |
|||
|
New Software |
||||
|
New FTE (Total Annual Cost) |
||||
|
Contract Services |
10,000 |
|||
|
Associated Training |
5,000 |
|||
|
Communications |
50,000 |
100,000 |
100,000 |
100,000 |
Please list Other Major Costs and their associated dollar amounts:
11. PROJECT SCHEDULE
Please complete the following table.
|
FY |
Qtr 1 |
Qtr 2 |
Qtr 3 |
Qtr 4 |
|
|
Start Date |
98 |
X |
|||
|
Completion Date |
98 |
X |
8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.
PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).
PROJECT 5 - Implementation of Banner Web
STRATEGIC OVERVIEW
1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.
This is a customer service enhancement that will provide students direct access to register, obtain grades, and transact most business with the university from any internet web browser.
2. When this IT project is categorized by "project type," which major category best describes it?
|
Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column. |
|||||
|
Application Development |
Hardware |
Software |
Networking |
Training |
Some Other? Please list below. |
|
X |
X |
DATA COLLECTION |
|||
3. Please describe any new/emerging technologies involved with this IT Project.
Three tier Web – Database interaction.
4. Please describe any statutory changes required for this project.
5. If this project can or should allow for public access, please describe how.
Public access for admission applications and other information.
6. Please identify the platform type.
|
Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column. |
|||
|
Mainframe |
Mid-Tier |
PC |
Some Other? Please explain below. |
|
X |
X |
X |
INTERNET |
Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".
1. Please describe the proposed system hardware.
This will run on existing Alpha Server 4100 5/466 w/2GB RAM and 50GB disk/FDDI backbone connected.
2. Please describe the proposed system software.
Web/database transaction interface
3. In A., B., and C. below, please describe the proposed telecommunications impact.
4. How many new FTEs are associated with this project?
10.
COSTS
Please complete the following table as it is pertinent to the specific date of the project.
|
FY98 |
FY99 |
FY00 |
FY01 |
|
|
New Hardware |
||||
|
New Software |
||||
|
New FTE (Total Annual Cost) |
||||
|
Contract Services |
||||
|
Associated Training |
||||
|
Communications |
Please list Other Major Costs and their associated dollar amounts:
11. PROJECT SCHEDULE
Please complete the following table.
|
FY |
Qtr 1 |
Qtr 2 |
Qtr 3 |
Qtr 4 |
|
|
Start Date |
97 |
X |
|||
|
Completion Date |
98 |
X |
8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.
PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).
PROJECT 1 – FY00/01 – Augmentation of Campus Fiber/Cable Plant
STRATEGIC OVERVIEW
1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.
Fiber and Cat 5 Plus cable and distribution systems needed for anticipated bandwidth growth.
2. When this IT project is categorized by "project type," which major category best describes it?
|
Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column. |
|||||
|
Application Development |
Hardware |
Software |
Networking |
Training |
Some Other? Please list below. |
|
X |
|||||
3. Please describe any new/emerging technologies involved with this IT Project.
Fiber and Cat 5 Plus cable and distribution systems.
4. Please describe any statutory changes required for this project.
5. If this project can or should allow for public access, please describe how.
6. Please identify the platform type.
|
Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column. |
|||
|
Mainframe |
Mid-Tier |
PC |
Some Other? Please explain below. |
|
NETWORKING |
|||
Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".
1. Please describe the proposed system hardware.
2. Please describe the proposed system software.
3. In A., B., and C. below, please describe the proposed telecommunications impact.
4. How many new FTEs are associated with this project?
10.
COSTS
Please complete the following table as it is pertinent to the specific date of the project.
|
FY98 |
FY99 |
FY00 |
FY01 |
|
|
New Hardware |
||||
|
New Software |
||||
|
New FTE (Total Annual Cost) |
||||
|
Contract Services |
||||
|
Associated Training |
||||
|
Communications |
250,000 |
250,000 |
250,000 |
Please list Other Major Costs and their associated dollar amounts:
11. PROJECT SCHEDULE
Please complete the following table.
|
FY |
Qtr 1 |
Qtr 2 |
Qtr 3 |
Qtr 4 |
|
|
Start Date |
99 |
X |
|||
|
Completion Date |
02 |
X |
8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.
PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).
PROJECT 2 – FY00-01 Expansion of Video Server
STRATEGIC OVERVIEW
1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.
2. When this IT project is categorized by "project type," which major category best describes it?
|
Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column. |
|||||
|
Application Development |
Hardware |
Software |
Networking |
Training |
Some Other? Please list below. |
|
X |
X |
X |
|||
3. Please describe any new/emerging technologies involved with this IT Project.
DVD jukebox and MPEG2 Video with compression delivery on demand.
4. Please describe any statutory changes required for this project.
5. If this project can or should allow for public access, please describe how.
6. Please identify the platform type.
|
Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column. |
|||
|
Mainframe |
Mid-Tier |
PC |
Some Other? Please explain below. |
|
X |
X |
NETWORK STORAGE SERVER |
|
Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".
1. Please describe the proposed system hardware.
Network storage server with over 1TB capacity.
2. Please describe the proposed system software.
Unknown
3. In A., B., and C. below, please describe the proposed telecommunications impact.
High bandwidth switched service.
Video on demand.
4. How many new FTEs are associated with this project?
10.
COSTS
Please complete the following table as it is pertinent to the specific date of the project.
|
FY98 |
FY99 |
FY00 |
FY01 |
|
|
New Hardware |
250,000 |
250,000 |
||
|
New Software |
50,000 |
50,000 |
||
|
New FTE (Total Annual Cost) |
||||
|
Contract Services |
20,000 |
|||
|
Associated Training |
||||
|
Communications |
Please list Other Major Costs and their associated dollar amounts:
11. PROJECT SCHEDULE
Please complete the following table.
|
FY |
Qtr 1 |
Qtr 2 |
Qtr 3 |
Qtr 4 |
|
|
Start Date |
99 |
X |
|||
|
Completion Date |
01 |
X |
8. Project Details. For EACH of the projects you listed in Section 7., please complete the following information.
PROJECT NUMBER (Insert a number, from 1 through 8, to correspond with Section 7. of this survey).
PROJECT 3 – FY00-01 – Wireless Campus Initiative.
STRATEGIC OVERVIEW
1. Does this project represent a NEW development OR MAINTENANCE of an existing business process? Please explain.
NEW
2. When this IT project is categorized by "project type," which major category best describes it?
|
Please place an X under tlle appropriate category. If another term better describes this project, please list that term in the "Some Other?" column. |
|||||
|
Application Development |
Hardware |
Software |
Networking |
Training |
Some Other? Please list below. |
|
X |
|||||
3. Please describe any new/emerging technologies involved with this IT Project.
PCS and Spreadspectrum wireless.
4. Please describe any statutory changes required for this project.
5. If this project can or should allow for public access, please describe how.
6. Please identify the platform type.
|
Place an X under the appropriate category. If none of the listed categories are appropriate, please provide an explanation in the "Some Other?" column. |
|||
|
Mainframe |
Mid-Tier |
PC |
Some Other? Please explain below. |
|
X |
X |
NETWORKING |
|
Are there NEW hardware, software, telecommunications, or personnel resources associated with this project? If so, Please detail those resources in parts 1-4 below. If you are unsure of this information, please answer the question with "Uncertain".
1. Please describe the proposed system hardware.
Wireless connections to ATM backbone and PBX.
2. Please describe the proposed system software.
3. In A., B., and C. below, please describe the proposed telecommunications impact.
4. How many new FTEs are associated with this project?
10.
COSTS
Please complete the following table as it is pertinent to the specific date of the project.
|
FY98 |
FY99 |
FY00 |
FY01 |
|
|
New Hardware |
50,000 |
50,000 |
150,000 |
150,000 |
|
New Software |
||||
|
New FTE (Total Annual Cost) |
||||
|
Contract Services |
||||
|
Associated Training |
5,000 |
5,000 |
||
|
Communications |
Please list Other Major Costs and their associated dollar amounts:
11. PROJECT SCHEDULE
Please complete the following table.
|
FY |
Qtr 1 |
Qtr 2 |
Qtr 3 |
Qtr 4 |
|
|
Start Date |
98 |
X |
|||
|
Completion Date |
01 |
X |
12. HARDWARE INVENTORY:
How many of the following systems do you have installed in your department (including divisions/agencies within your department).
|
1.Pentium Pro machines / Pentium II |
165 |
|
2. Pentium based machines |
675 |
|
3. 80486 based machines |
810 |
|
4. 80386 based machines |
0 |
|
5. 80286 or older machines |
0 |
|
6. Macintosh's |
221 |
|
7.RISC based workstations (Please specify) Silicon Graphics |
2 |
|
8. Alpha PC's |
12 |
|
9. Power PC's |
5 |
|
10.Other Hardware 1 DEC Alpha 4100 |
3 |
|
11.Other Hardware 2 DEC Alpha 2100 |
2 |
|
12.Other Hardware 3 DEC VAX 6000 |
2 |
13. SOFTWARE INVENTORY
Which of the following software products do you have installed in your department:
|
DESKTOP APPLICATIONS |
|
|
COREL SUITE (Any Version) |
43 |
|
MICROSOFT SUITE (Any Version) |
1050 |
|
LOTUS SUITE (Any Version) |
125 |
|
OTHER SUITE I |
|
|
OTHER SUITE 2 |
|
|
OTHER SUITE 3 |
|
|
WordPerfect (Any Version) |
875 |
|
QUARTO PRO (Any Version) |
130 |
|
PARADOX (Any Version) |
110 |
|
WORD (Any Version) |
40 |
|
ACCESS (Any Version) |
20 |
|
EXCEL (Any Version) |
20 |
|
LOTUS 1-2-3 (Any Version) |
|
|
OTHER APPLICATION I MATHEMATICA |
110 |
|
OTHER APPLICATION 2 SAS |
150 |
|
OTHER APPLICATION 3 SPSS |
500 |
|
DESKTOP OPERATING SYSTEMS |
|
|
OS/2 |
10 |
|
WIN DOWS 3.1X |
150 |
|
WINDOWS-95 |
1750 |
|
WINDOWS NT – WORKSTATION VERSION 3.50 OR OLDER |
|
|
WINDOWS NT – WORKSTATION VERSION 3.51 |
|
|
WINDOWS NT – WORKSTATION VERSION 4.0 |
85 |
|
OTHER OPERATING SYSTEM 1 Open VMS Alpha |
15/unlimited |
|
OTHER OPERATING SYSTEM 2 Digital UNIX |
15/unlimited |
|
OTHER OPERATING SYSTEM 3 IBM AIX |
5/unlimited |
|
NETWORK OPERATING SYSTEMS |
|
|
WINDOWS NT SERVER VERSION 3.50 OR OLDER |
|
|
WINDOWS NT SERVER VERSION 3.51 |
|
|
WINDOWS NT SERVER VERSION 4.0 |
15/1750 |
|
NOVELL NETWARE VERSION 3.11 OR OLDER |
5/500 |
|
NOVELL NETWARE VERSION 3.12 |
|
|
NOVELL NETWARE VERSION 4.01 |
|
|
NOVELL NETWARE VERSION4.10 |
|
|
NOVELL NETWARE VERSION 4.11 |
4/1700 |
|
OS/2 WAPP SERVER |
|
|
OS/2 LAN SERVER |
|
|
OTHER NOS I Samba/Digital UNIX/Linix |
5/unlimited |
|
OTHER NOS 2 |
|
|
OTHER NOS 3 |
|
|
NETWORK APPLICATIONS - RDBMS |
|
|
MS SQL SERVER |
3/1750 |
|
ORACLE |
5/544 |
|
SYBASE |
|
|
WATCOM |
|
|
DB2 |
|
|
OTHER RDBMS 1 |
|
|
OTHER RDBMS 2 |
|
|
OTHER RDBMS 3 |
|
|
E-MAIL PACKAGES |
|
|
NOVELL GROUPWISE |
180 |
|
MS MAIL |
|
|
MS EXCHANGE SERVER |
2/1750 |
|
CC MAIL |
|
|
LOTUS NOTES |
|
|
MHS/FIRST MAIL |
|
|
OTHER E-MAIL PACKAGE 1 PINE |
UNLIMITED |
|
OTHER E-MAIL PACKAGE 2 ALL-IN-1 |
UNLIMITED |
|
OTHER E-MAIL PACKAGE 3 |
|
|
COMMUNICATIONS SERVERS |
|
|
SNA SERVER |
|
|
SAA SERVER |
1/100 |
|
OTHER COMMUNICATIONS SERVER 1 |
|
|
OTHER COMMUNICATIONS SERVER 2 |
|
|
OTHER COMMUNICATIONS SERVER 3 |
|
14. ORGANIZATION CHART
Please provide two separate organizational charts for your department; one chart that shows the department as a whole and the other chart shows the MIS section. If there are multiple MIS units within your department, they all should be noted and a separate organization chart pertaining to each MIS sections should be provided. You can mail the organizational charts via interdepartmental mail (along with the survey on a diskette) to the attention of Deepesh Randeri at IS&C Building 6 Room B- I IO.
THANK YOU! We appreciate the time and effort you have extended to make the new Information Technology information document. If you have questions about this survey, please contact Deepesh Randeri of IS&C at 558-1360.