{"id":2669,"date":"2023-07-06T09:03:49","date_gmt":"2023-07-06T14:03:49","guid":{"rendered":"https:\/\/www.marshall.edu\/cos\/?page_id=2669"},"modified":"2026-03-06T10:11:18","modified_gmt":"2026-03-06T15:11:18","slug":"master-plan","status":"publish","type":"page","link":"https:\/\/www.marshall.edu\/cos\/master-plan\/","title":{"rendered":"College of Science in the Master Plan"},"content":{"rendered":"<p><a href=\"https:\/\/www.marshall.edu\/masterplan\/files\/Presentation-for-Master-Plan-website.pdf\"><img loading=\"lazy\" decoding=\"async\" class=\"rounded-lg alignright wp-image-2670 size-medium\" src=\"http:\/\/www.marshall.edu\/cos\/files\/master-plan-2023-300x169.jpg\" alt=\"Marshall University 2023 Master Plan\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.marshall.edu\/cos\/files\/master-plan-2023-300x169.jpg 300w, https:\/\/www.marshall.edu\/cos\/files\/master-plan-2023.jpg 600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>Marshall University&#8217;s recently approved <a href=\"https:\/\/www.marshall.edu\/masterplan\/2023-master-plan\/\">2023 Master Plan<\/a> marks a significant milestone in our institution&#8217;s development. After a comprehensive 10-month process that involved focus groups, workshops, surveys, and interviews &#8211; the Master Plan was unanimously endorsed by the Board of Governors on June 21st. This strategic document will serve as a guiding light for the university&#8217;s development over the next decade, providing a roadmap for progress and growth.<\/p>\n<p>As we embark on this transformative journey, it&#8217;s important to note that projects identified within the Master Plan will still need to undergo thorough assessment. Each project will undergo a feasibility study lasting 6-9 months, followed by a design phase lasting 6-24 months. Finally, construction will take place over a period of 3-36 months, bringing these projects to fruition. This structured approach ensures that our endeavors are backed by thorough research, careful planning, and meticulous execution.<\/p>\n\t\t<a href=\"#2025update\" target=\"_self\" class=\"button brown-text \">\n\t\t<span>Jump to 2025 Update<\/span>\n\t<\/a>\n\t\n<h2>Science Building Renovation<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"rounded-lg alignright wp-image-2672 size-medium\" src=\"http:\/\/www.marshall.edu\/cos\/files\/master-plan-science-renovation-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.marshall.edu\/cos\/files\/master-plan-science-renovation-300x169.jpg 300w, https:\/\/www.marshall.edu\/cos\/files\/master-plan-science-renovation.jpg 600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>One of the priority projects identified in the Master Plan is a renovation of the Science Building. With a budget of $110 million, this ambitious project is set to breathe new life into our esteemed Science Building. As we embark on the 2023-2024 academic year, we eagerly anticipate the planning and design phase, laying the foundation for the transformative construction expected to commence in spring 2025. The renovated Science Building will be a testament to our commitment to providing cutting-edge facilities that foster innovation, collaboration, and academic excellence.<\/p>\n<h2>Additional Projects<\/h2>\n<p>Additionally, the College of Science will benefit from other identified projects. Classroom renovations, supported by a $1 million investment, will enhance the learning experience for students. Measures to address flooding, funded with $4 million, will mitigate potential risks to health and safety, equipment, and buildings. Moreover, the venerable Smith Hall will undergo a significant $22.1 million renovation, revitalizing its facilities and further enhancing the academic experience for students and faculty alike.<\/p>\n<h2>Commitment to Transforming Lives<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"rounded-lg alignright wp-image-2693 size-medium\" src=\"http:\/\/www.marshall.edu\/cos\/files\/marshall-students-old-main-e1688997272982-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.marshall.edu\/cos\/files\/marshall-students-old-main-e1688997272982-300x169.jpg 300w, https:\/\/www.marshall.edu\/cos\/files\/marshall-students-old-main-e1688997272982.jpg 600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>The Master Plan represents our unwavering commitment to creating a dynamic and forward-thinking educational environment. With the Science Building renovation at the forefront and the generous investments in classroom upgrades, flooding interventions, and Smith Hall renovations, we are poised to elevate the educational experience for current students as well as students for years to come. As we embark on this exciting journey, we invite you to stay connected and witness the transformative power of the Master Plan as it unfolds before our very eyes. Together, we will shape the future of Marshall University, paving the way for generations of knowledge and innovation to come.<\/p>\n<h2>Stay Connected<\/h2>\n<p>The 2023 Marshall University Master Plan represents a tremendous commitment to academic excellence. The identified priority projects have generated a lot of excitement on campus and present a marvelous opportunity to connect, or possibly reconnect, with the Marshall community. Giving to the College of Science can go further than ever with projects already in the works. As always, gifts of any size to the College of Science are welcomed and valued by our faculty and students. Please feel free to reach out to us, regarding giving or just to say &#8220;hi&#8221;, at any time. We&#8217;d love to hear from you.<br \/>\n<a id=\"2025update\" name=\"2025update\"><\/a><\/p>\n<h2>Update: 2025 Progress<\/h2>\n<p>Several exciting updates are underway at the College of Science. While not easily visible, one of the most significant improvements is the upgraded HVAC system in the Science Building. Students and faculty alike should feel the difference in comfort and air quality starting Fall 2025. A frequently-used computer lab in Corbly Hall has also been refurbished over the summer, offering a more modern and efficient workspace for science courses. In addition, classrooms in Smith Hall and Morrow Library have been redeveloped to better support courses. Looking ahead, more renovation projects are planned for the Science Building to continue enhancing the student experience.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"marsha-row flex flex-wrap -mx-2 lg:-mx-6 py-6 border-b border-gray-100\"><div class=\"columns w-full lg:w-1\/6 lg:px-6 mt-6 lg:mt-0\"><img decoding=\"async\" src=\"https:\/\/www.marshall.edu\/cos\/files\/stites-2-200x300.jpg\"  srcset=\"https:\/\/www.marshall.edu\/cos\/files\/stites-2-683x1024.jpg 683w, https:\/\/www.marshall.edu\/cos\/files\/stites-2-200x300.jpg 200w, https:\/\/www.marshall.edu\/cos\/files\/stites-2.jpg 800w\" alt=\"http:\/\/Wesley%20Stites\" class=\"rounded-lg\" \/><\/div><div class=\"columns w-full lg:w-3\/4 lg:px-6 mt-6 lg:mt-0 entry-content\"><div class=\"text-xl font-semibold uppercase\"><a href=\"https:\/\/www.marshall.edu\/cos\/profile\/wesley-stites\/\">Wesley Stites<\/a><\/div><div class=\"mt-3 mb-4\"><div class=\"font-semibold mb-1\">College of Science Dean<\/div><a href=\"https:\/\/www.marshall.edu\/cos\/directory\/administration\/\" rel=\"tag\">COS Administration<\/a><\/div><div class=\"flex items-center my-2\"><svg class=\"text-gray-500 fill-current h-4 w-4 mr-4\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 384 512\"><path fill=\"currentColor\" d=\"M172.268 501.67C26.97 291.031 0 269.413 0 192 0 85.961 85.961 0 192 0s192 85.961 192 192c0 77.413-26.97 99.031-172.268 309.67-9.535 13.774-29.93 13.773-39.464 0zM192 272c44.183 0 80-35.817 80-80s-35.817-80-80-80-80 35.817-80 80 35.817 80 80 80z\"><\/path><\/svg>Science Building 270<\/div><div class=\"flex items-center my-2\"><svg class=\"text-gray-500 fill-current h-4 w-4 mr-4\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\"><path fill=\"currentColor\" d=\"M493.4 24.6l-104-24c-11.3-2.6-22.9 3.3-27.5 13.9l-48 112c-4.2 9.8-1.4 21.3 6.9 28l60.6 49.6c-36 76.7-98.9 140.5-177.2 177.2l-49.6-60.6c-6.8-8.3-18.2-11.1-28-6.9l-112 48C3.9 366.5-2 378.1.6 389.4l24 104C27.1 504.2 36.7 512 48 512c256.1 0 464-207.5 464-464 0-11.2-7.7-20.9-18.6-23.4z\"><\/path><\/svg>304-696-2424<\/div><div class=\"flex items-center my-2\"><svg class=\"text-gray-200 fill-current h-5 w-5 mr-4\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\"><path fill=\"currentColor\" d=\"M502.3 190.8c3.9-3.1 9.7-.2 9.7 4.7V400c0 26.5-21.5 48-48 48H48c-26.5 0-48-21.5-48-48V195.6c0-5 5.7-7.8 9.7-4.7 22.4 17.4 52.1 39.5 154.1 113.6 21.1 15.4 56.7 47.8 92.2 47.6 35.7.3 72-32.8 92.3-47.6 102-74.1 131.6-96.3 154-113.7zM256 320c23.2.4 56.6-29.2 73.4-41.4 132.7-96.3 142.8-104.7 173.4-128.7 5.8-4.5 9.2-11.5 9.2-18.9v-19c0-26.5-21.5-48-48-48H48C21.5 64 0 85.5 0 112v19c0 7.4 3.4 14.3 9.2 18.9 30.6 23.9 40.7 32.4 173.4 128.7 16.8 12.2 50.2 41.8 73.4 41.4z\"><\/path><\/svg><a href=\"mailto:stites@marshall.edu\">stites@marshall.edu<\/a><\/div><\/div><\/div>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www.marshall.edu\/cos\/giving-to-the-college-of-science\/\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-404\" src=\"http:\/\/www.marshall.edu\/cos\/files\/give-to-the-college-of-science.png\" alt=\"Give to the College of Science\" width=\"450\" height=\"100\" srcset=\"https:\/\/www.marshall.edu\/cos\/files\/give-to-the-college-of-science.png 450w, https:\/\/www.marshall.edu\/cos\/files\/give-to-the-college-of-science-300x67.png 300w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Marshall University&#8217;s recently approved 2023 Master Plan marks a significant milestone in our institution&#8217;s development. After a comprehensive 10-month process that involved focus groups, workshops, surveys, and interviews &#8211; the Master Plan was unanimously endorsed by the Board of Governors on June 21st. This strategic document will serve as a guiding light for the university&#8217;s<\/p>\n","protected":false},"author":224,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-2669","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.marshall.edu\/cos\/wp-json\/wp\/v2\/pages\/2669","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.marshall.edu\/cos\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.marshall.edu\/cos\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.marshall.edu\/cos\/wp-json\/wp\/v2\/users\/224"}],"replies":[{"embeddable":true,"href":"https:\/\/www.marshall.edu\/cos\/wp-json\/wp\/v2\/comments?post=2669"}],"version-history":[{"count":26,"href":"https:\/\/www.marshall.edu\/cos\/wp-json\/wp\/v2\/pages\/2669\/revisions"}],"predecessor-version":[{"id":5116,"href":"https:\/\/www.marshall.edu\/cos\/wp-json\/wp\/v2\/pages\/2669\/revisions\/5116"}],"wp:attachment":[{"href":"https:\/\/www.marshall.edu\/cos\/wp-json\/wp\/v2\/media?parent=2669"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}