{"id":278,"date":"2015-07-08T12:46:42","date_gmt":"2015-07-08T17:46:42","guid":{"rendered":"http:\/\/www.marshall.edu\/leedgreen\/?page_id=278"},"modified":"2022-06-21T13:37:40","modified_gmt":"2022-06-21T18:37:40","slug":"regional-priority-rp","status":"publish","type":"page","link":"https:\/\/www.marshall.edu\/leedgreen\/regional-priority-rp\/","title":{"rendered":"Regional Priority (RP)"},"content":{"rendered":"<p>The Regional Priority (RP) category accumulates points based on environmental issues from the region.<\/p>\n<p><a href=\"https:\/\/www.usgbc.org\/credits\/new-construction\/v4\/regional-priority\">Learn more about USGBC Regional Priority (RP)<\/a><\/p>\n<hr \/>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-75 alignleft\" src=\"http:\/\/www.marshall.edu\/leedgreen\/files\/USGBC-logo.jpg\" alt=\"USGBC-logo\" width=\"89\" height=\"89\" srcset=\"https:\/\/www.marshall.edu\/leedgreen\/files\/USGBC-logo.jpg 300w, https:\/\/www.marshall.edu\/leedgreen\/files\/USGBC-logo-150x150.jpg 150w\" sizes=\"auto, (max-width: 89px) 100vw, 89px\" \/>Below is a chart of points for Marshall University&#8217;s new <a href=\"https:\/\/www.marshall.edu\/LEEDGreen\">Arthur Weisberg Family Applied Engineering Complex (AEC)<\/a>, currently\u00a0awaiting response from the US Green Building Council (USGBC).<\/p>\n<table width=\"100%\">\n<caption>Regional Priority (RP) &#8211; Project Checklist Chart: [3 out of 4 points]\nLEED 2009 for New Construction and Major Renovations<br \/>\n<\/caption>\n<tbody>\n<tr>\n<td width=\"23\"><strong>3<\/strong><\/td>\n<td width=\"23\"><strong>1<\/strong><\/td>\n<td width=\"23\"><strong>0<\/strong><\/td>\n<td width=\"27\"><strong>\u00a0<\/strong><\/td>\n<td colspan=\"3\"><strong>REGIONAL PRIORITY (RP)<\/strong><\/td>\n<td style=\"\" width=\"150\"><strong>Possible Points:<\/strong><\/td>\n<td width=\"41\"><strong>4<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"23\"><\/td>\n<td width=\"23\"><\/td>\n<td width=\"23\"><\/td>\n<td width=\"27\"><\/td>\n<td width=\"61\"><\/td>\n<td><\/td>\n<td><\/td>\n<td width=\"181\"><\/td>\n<td width=\"41\"><\/td>\n<\/tr>\n<tr>\n<td width=\"23\">Y<\/td>\n<td width=\"23\">?<\/td>\n<td width=\"23\">N<\/td>\n<td width=\"27\"><\/td>\n<td width=\"61\"><\/td>\n<td><\/td>\n<td><\/td>\n<td width=\"181\"><\/td>\n<td width=\"41\"><\/td>\n<\/tr>\n<tr>\n<td width=\"23\"><strong>1<\/strong><\/td>\n<td width=\"23\"><strong>\u00a0<\/strong><\/td>\n<td width=\"23\"><strong>\u00a0<\/strong><\/td>\n<td bgcolor=\"#ffff33\" width=\"27\"><strong>d<\/strong><\/td>\n<td width=\"80\">Credit 1.1<\/td>\n<td colspan=\"3\"><strong>Regional Priority: SSc4.4<\/strong><\/td>\n<td width=\"41\">1<\/td>\n<\/tr>\n<tr>\n<td width=\"23\"><strong>1<\/strong><\/td>\n<td width=\"23\"><strong>\u00a0<\/strong><\/td>\n<td width=\"23\"><strong>\u00a0<\/strong><\/td>\n<td bgcolor=\"#ffff33\" width=\"27\"><strong>d<\/strong><\/td>\n<td width=\"61\">Credit 1.2<\/td>\n<td colspan=\"3\"><strong>Regional Priority: SSc6.1<\/strong><\/td>\n<td width=\"41\">1<\/td>\n<\/tr>\n<tr>\n<td width=\"23\"><strong>\u00a0<\/strong><\/td>\n<td width=\"23\"><strong>1<\/strong><\/td>\n<td width=\"23\"><strong>\u00a0<\/strong><\/td>\n<td width=\"27\"><strong>C<\/strong><\/td>\n<td width=\"61\">Credit 1.3<\/td>\n<td colspan=\"3\"><strong>Regional Priority: SSc7.1<\/strong><\/td>\n<td width=\"41\">1<\/td>\n<\/tr>\n<tr>\n<td width=\"23\"><strong>1<\/strong><\/td>\n<td width=\"23\"><strong>\u00a0<\/strong><\/td>\n<td width=\"23\"><strong>\u00a0<\/strong><\/td>\n<td bgcolor=\"#ffff33\" width=\"27\"><strong>d\/C<\/strong><\/td>\n<td width=\"61\">Credit 1.4<\/td>\n<td colspan=\"3\"><strong>Regional Priority: SSc8 OR MRC2<\/strong><\/td>\n<td width=\"41\">1<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Regional Priority (RP) category accumulates points based on environmental issues from the region. Learn more about USGBC Regional Priority (RP) Below is a chart of points for Marshall University&#8217;s new Arthur Weisberg Family Applied Engineering Complex (AEC), currently\u00a0awaiting response from the US Green Building Council (USGBC). Regional Priority (RP) &#8211; Project Checklist Chart: [3<\/p>\n","protected":false},"author":95,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-278","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.marshall.edu\/leedgreen\/wp-json\/wp\/v2\/pages\/278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.marshall.edu\/leedgreen\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.marshall.edu\/leedgreen\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.marshall.edu\/leedgreen\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.marshall.edu\/leedgreen\/wp-json\/wp\/v2\/comments?post=278"}],"version-history":[{"count":1,"href":"https:\/\/www.marshall.edu\/leedgreen\/wp-json\/wp\/v2\/pages\/278\/revisions"}],"predecessor-version":[{"id":533,"href":"https:\/\/www.marshall.edu\/leedgreen\/wp-json\/wp\/v2\/pages\/278\/revisions\/533"}],"wp:attachment":[{"href":"https:\/\/www.marshall.edu\/leedgreen\/wp-json\/wp\/v2\/media?parent=278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}